
A chimney repair scope both sides can sign
Have a scope written
Leave the property address, which side you represent and the finding the request is about. We ring back to arrange the inspection or the repair visit.
A sample scope, read line by line
Repair requests stall when the wording is loose. 'Fix chimney as needed' means one thing to a seller and another to a buyer, and the argument surfaces at the final walk-through. Our scope is built so that each line can be ticked off by someone who has never been on the roof.
The order of the lines is fixed. A reader on either side can find the same fact in the same place on every scope we write, whether the job is a cap in Santa Ana or a firebox in Orange.
- Where: which fireplace and which stack, named the way the listing names the rooms.
- Why: the finding, with the number of the inspection photo that shows it.
- What comes out: the cracked, rusted or loose material being removed.
- What goes in: the new part and what it is made of, such as concrete, stainless steel or firebrick.
- Price: our list price when the repair has one, otherwise a figure written for that job alone.
- Permit: whether the city is expected to ask for one, and who applies.
- Proof: photographs taken before the work, with the work open, and when it is finished.
Fitting the work in ahead of closing
We will not name a finish date we cannot see from here. What you get at booking is the shape of the job: whether it is a single visit or several, whether a part has to be ordered, whether mortar or concrete needs dry weather and time to cure, and whether a city inspector has to sign at the end. With those four answers an agent can judge for herself whether the repair belongs before closing or after.
When the calendar is too short for the work, the scope keeps its value. The description and the price are still in writing, so the two sides can settle on a figure in place of a repair, and the buyer can book the job once the house is theirs. We stay out of that negotiation and supply the document it rests on.
Paper for the buying side and the selling side
The party who pays is our client, and the scope and the invoice are addressed to that party. Agents are copied when the client says so. At the end of the job a completion sheet repeats every scope line with the word done beside it and the finished photograph underneath, which is the page most often forwarded across the table.
Some repairs sit inside the flue where nobody at a walk-through can see them. A buyer's side that wants that work shown on video can order a fresh filmed inspection once the repair is complete. It is billed as a new Level 2 at $395 and produces its own dated report.
The scope starts from a Level 2, not from a hunch
A line in the general inspection saying the fireplace needs a specialist is a prompt, not a finding. Before anything can be scoped the flue has to be filmed and the roof-level parts photographed. That is the $395 Level 2, and its report is the document every later page refers back to.
This matters most on listings where the fireplace has been restyled for sale. Fresh stone and a handsome new mantel say nothing about the firebox behind them or the liner above, and a remodeled face can sit in front of a flue no one has looked into for decades. The inspection separates what was decorated from what was repaired.
The priced starting point
Every scope is written from an inspection we carried out. The repair figures themselves appear on the scope.
- Filmed inspection that the repair scope is drawn from
- $395
Caps, leak repairs, roof saddles and gas inserts carry list prices shown on our code repairs page. Other repairs are given a written figure for the job in question.
What agents ask about repairs in escrow
Whose name goes on the work order?
The party paying for the repair. In most escrows that is the seller, and now and then it is a buyer working with money taken off the price. We act on that one party's instructions and copy the agents when told to.
Can you write a scope from another company's inspection report?
We read it, and we price from what we have seen with our own equipment. A crown that the report documents plainly can sometimes be quoted from it. A cap is quoted after we measure. Anything inside the flue waits for our own camera.
What if the repair will not fit before the closing date?
Then the scope and its price become what the two sides bargain with. How that is settled is for the agents, the principals and escrow. Our part is a description and a figure that hold still while they talk.
Does the other side get to see the finished work?
They see it when our client forwards the completion sheet, which shows each scope line with its finished photograph. We do not send documents to a party who is not our client without the client's say.
Will the repair need a city permit?
Upkeep such as a cap or a rebuilt crown generally does not. Work on gas piping, a new gas appliance or the structure of the stack generally does, and the building department of the city concerned decides. The scope carries a permit line either way.
Repair request on the table in Orange?
Our contact page has the form. Give the property address, the side you represent and the finding in question, and we come back to you with either an inspection slot or a scope visit.
Call (657) 233-4699